Frequently asked questions in connection with NOM.
Table of contents:
I bought a VG, would like to standardize. What do I need?
- Valid Producer Statementt
- One leadable electro-mechanical counter
When these are present then can only start the technical examination before NOM. (First standardization )
I bought a functioning GM, would like to standardize. What do I need?
- Valid Producer Statement
- Viewing of bill or contract of sale
When these are present then can only start the technical examination before NOM. (Periodical standardization )
I bought a functioning VG, would like to standardize. What do I need?
- Valid Producer Statement
- Viewing of bill or contract of sale
When these are present then can only start the technical examination before NOM. (Periodical standardization )
The standardizing validation of my GM has expired, would like to re-standardize. What do I need?
When these are present then can only start the technical examination before NOM. (Periodical standardization )
The standardizing validation of my VG has expired, would like to re-standardize. What do I need?
When these are present then can only start the technical examination before NOM. (Periodical standardization )
Would like to change software in my GM. What do I need?
- Valid Producer Statement
- The copy of the vaild standardization warrant
- The data medium which contains the new software (eprom, CD, hard disk etc.)
- When the exchange of the software means the exchange of the command card (CPU), then the data in the IMD of the former command card is also needed to save
When these are present then can only start the NOM. (Data modifying standardization )
Would like to exchange the disabled counter in my GM. What do I need?
- Valid Producer Statement
- The copy of the vaild standardization warrant
- The same substitute as the disabled counter
When these are present then can only start the NOM. (Data modifying standardization )
Would like to exchange the disabled IMD in my GM. What do I need?
- Valid Producer Statement
- The copy of the vaild standardization warrant
- The same substitute as the disabled IMD
When these are present then can only start the NOM. (Data modifying standardization )
Would like to equip my GM with a banknote-acceptor. What do I need?
- Valid Producer Statement
- The copy of the vaild standardization warrant
- The banknote-acceptor which is prescripted in the type-licence
When these are present then can only start the NOM. (Data modifying standardization )
I stopped my GM, would like to use the IMD from it. How can I do it?
Would like to operate more gameplaced GM seperately. How shall I do it?
Because the number of gameplaces to modify can only be done with the GM, where the type-licence contains it, that's how in case of DUPLEX, TRIPLEX with seperate production number has to be standardized the GM . (Periodical standardization)
Would like to operate one of my GM which works in Jackpot-system somewhere else. What shall I do?
Would like to change software in one of my GM which works in Jackpot-system. What shall I do?
Would like to change software in one of my GM which works in Jackpot-system. What shall I do?
About every standardization outside the laboratory in decided by the Standardizator. According to the practical experiences it happens when the sizes or numbers of the VG, GM to standardize is beyond the frameworks of the economic tranportation.(roulette, big screen games, I. category room with more than 10 GMs).
In case of periodical standardization my GM didn't recieve a two-year validation. Why?
How can I decide if my Producer Statement is valid?
Every Producer Statement contains: production number, Szth number, end of validation, the stamp of the producer, NOM standardization stamp.
|
|